Construction Hoists supplied for St Botolphs Tower Aldgate London.
The hoists supplied were twin 20/32 with steel bridges accessing directly on to the building, and a single 18/45 passenger hoist with a 2m wide cage on to a common tower. This configuration being chosen due to the restricted width within the roadway. Inside the building there has been a M23/32 Goods only hoist for access from the loading bay down to the basement levels, and a special modular goods hoist for accessing the upper ground level, made so it can be brought in to the building via the goods hoist from the loading bay. Fo more details of UBS projects visit http://www.ubsl.net/projects_gallery.asp