The final segment to the bridge has been installed.
Related Videos
- ORBP: East End Bridge july 2016 update
- East End Bridge IN tower Final Pour
- ORBP: East End Bridge Crossing update
- ORBP: East End Bridge update
- ORBP: East end bridge progress
- ORBP: East End Bridge progress
- Collapsed Manitowoc 4100 ringer on east end bridge!
- Replacement ringer being assembled on the east end bridge
- First ride over the brand new “Lewis & Clark” (east end bridge)!
- ORBP: East End Bridge progress
- ORBP: East End Crossing update
- ORBP: East End Crossing update, IN tower topped out
- ORBP:I-64E to I-65 S on ramp beam install
- ORBP: setting last segment between towers 4 & 5
- Padgetts Manitowoc Mlc300
- 31 meter suspended platform | Special | Altrex
- Thunder over Louisville 2013 finale HD
- Crane Repaint Tutorial pt.2.3 (Liebherr ltm1200 tear down pt 3)
- Thunder over Louisville 2013 HD
- final lg 1550 repaint update
- FINALLY, CAUGHT ONE OF THE ELUSIVE MANITOWOC 21000s AT WORK
- Scrap Straightening Machine
- Power Plant Dio Stopmotion #1
- KFC YUM! Center video 2