working on the downtown bridge in Louisville KY, to see photos, go to www.facebook.com/cranedude07
Related Videos
- Maxim Grove GMK 6450
- Cat D6N
- Cat 336E and 349E
- Cat 322CL and CP 563E
- CAT IT62H loader unloading piledriver parts
- ORBP:I-64E to I-65 S on ramp beam install
- ORBP: Walsh Manitowoc 3950 setting formwork frame
- Walsh Link belt 248 piledriving
- ORBP: Demolishing an old overpass
- ORBP: First bridge girder being set on downtown bridge
- ground breaking ceremony for Ohio River Bridges Project Downtown Crossing
- ORBP: Walsh Manitowoc 3950 clammin
- Volvo ECR 305cl seperating dirt/rocks
- ORBP: demolishing clark memorial bridge approach ramp
- ORBP: 2nd Liebherr 420 ECH going up on Downtown Crossing
- DayGlow Louisville KY
- Matt kenseths car hauler
- ORBP: East End Bridge update
- First ride over the brand new “Lewis & Clark” (east end bridge)!
- Sterett setting a beam on the Kennedy bridge approach ramp
- FINALLY, CAUGHT ONE OF THE ELUSIVE MANITOWOC 21000s AT WORK
- Louisville downtown arena progress 12/7/09
- Louisville downtown arena progress
- amquip RT8090 lifting steel beam