Work Platform of Building Walls Zlp Cradle Suspended

Tarehe 22 Mei, 2017

Work Platform of Building Walls Zlp Cradle Suspended

Work Platform of Building Walls Zlp Cradle Suspended is a temporary powered access configuration for facade construction, cleaning, painting or maintenance. Platform length, rated load, voltage, hoist model, wire ropes and roof suspension conditions should be confirmed for the actual project.

Work Platform of building walls ZLP Cradle Suspended Platform
Image of Work Platform of building walls ZLP Cradle Suspended Platform

Maelezo ya Haraka:

  • Mahali pa asili: Shanghai, Uchina (Bara)
  • Jina la Biashara: JH
  • Model Number:JH-ZLP-219
  • Lift Mechanism:Rack & Pinion
  • Lift Drive / Actuation:Electric Motor
  • Power:50HZ/60HZ
  • Rated Loading Capacity:250-1000kg
  • Min. Lifting Height:50m
  • Max. Urefu wa Kuinua: 200m
  • Table Size:1+2+3m /3*2.5m
  • Overall Dimensions:6m / 7m
  • Weight:1000kg
  • Certification:CE. GOST ISO
  • Warranty:12 Months
  • Huduma ya Baada ya Uuzaji Imetolewa: Wahandisi wanaopatikana kwa huduma za mashine nje ya nchi
  • Suspended Platform:Work Platform of building walls ZLP Cradle Suspended Platform
  • color:red or as clients need
  • power:220V or 380V etc
  • material:a-alloy or steel
  • Website:www.bjfth.com
  • Model Numbe:ZLP Series suspended platform
  • platform length:1-7.5m
  • Main Markets:Australia/South Asia/Eastern/Bazil/South Africa/UAE
  • Rated load:630kg/800kg/1000kg
  • work heighte:30-200m

Video inayohusiana:

Maelezo:

Work Platform of building walls ZLP Cradle Suspended Platform
Work Platform of building walls ZLP Cradle Suspended Platform

Onyesha Vifaa Vinavyohusiana:

Work Platform of building walls ZLP Cradle Suspended Platform Related Accessories Show
Work Platform of building walls ZLP Cradle Suspended Platform Related Accessories Show

Acha ujumbe:

Unaweza pia kupenda:

  • Work Platform of Building Walls Zlp Cradle Suspended - image 6

    Advanced from china zlp rope suspended platform with caster

    • Mahali pa asili: Shanghai, Uchina (Bara)
    • Jina la Biashara: Mafanikio
    • Nambari ya Mfano:ZLP250,ZLP500,ZLP630,ZLP800,ZLP1000
    • Huduma ya Baada ya Uuzaji Imetolewa: Wahandisi wanaopatikana kwa huduma za mashine nje ya nchi
    • Name:from china zlp rope suspended platform with caster
    • Rangi: hiari
    • Ugavi wa umeme (V):220,380,415,440
    • Kifaa cha Usalama:kipengee 7
    • Nyenzo: chuma au alumini
    • Matibabu ya uso: Kunyunyizia rangi au mabati ya dip-moto
    • Sehemu ya Bure: usambazaji
    • kamba ya chuma: mabati ya kuzamisha moto
    • Pandisha: Imetengenezwa kwa alumini ya kutupwa
    • Cheti:CE,ISO9001-2008
    Export to: Cape Town, Danang, London etc.
    Related Keywords: Multi Point Suspended Scaffold in Cape Town, Suspended Platforms Gondola
  • Work Platform of Building Walls Zlp Cradle Suspended - image 7

    extension suspended platform

    • Mahali pa asili: Shanghai, Uchina (Bara)
    • Jina la Biashara: Mafanikio
    • Nambari ya Mfano: ZLP800
    • After-sales Service Provided:Overseas third-party support available
    Export to: Pakistan, Singapore etc.
    Related Keywords: Safety Elevator Platform in Danang, Electricial Suspended Platform in London
  • Work Platform of Building Walls Zlp Cradle Suspended - image 8

    Lift work platform hanging gondola rope manual suspended scaffold cradle

    • Mahali pa asili: Shanghai, Uchina (Bara)
    • Jina la Biashara: Mafanikio
    • Nambari ya Mfano: ZLP250 ZLP500 ZLP630 ZLP800 ZLP1000
    • Rated load:1000kg
    • Kasi ya kuinua:8~10m/min
    • Urefu wa kuinua: 100 m
    • Kebo:100m
    • Uzito wa kukabiliana: 1000kg
    Export to: India , Oslo, Caracas, Cape Town etc.
    Related Keywords: Rope Suspended Aerial Platform in Pakistan, Suspended Platform Zlp in Singapore
  • Work Platform of Building Walls Zlp Cradle Suspended - image 9

    Success zlp rope suspended platform/cradle with caster

    • Hali:Mpya
    • Mahali pa asili: Shanghai, Uchina (Bara)
    • Jina la Biashara: FTH
    • Nambari ya mfano: ZLP630
    • Rated Loading Capacity(kg):630Kg
    • Kasi ya Kuinua:8-10m/min
    • Urefu wa Juu wa Kuinua: 100 m
    • Dimension(L*W*H):6000*(1+2+3m)*720*1300
    • Loder Weight:800KG
    • Huduma ya Baada ya Uuzaji Imetolewa: Wahandisi wanaopatikana kwa huduma za mashine nje ya nchi
    Export to: Kaohsiung, South Sudan, Caracas, India etc.
    Related Keywords: Suspended Platforms Gondola, Suspended Platform Zlp in Singapore
  • Work Platform of Building Walls Zlp Cradle Suspended - image 10

    ZLP Series Suspended Working Platform,Hanging Scaffolds System,Rope Suspended Platform

    • Mahali pa asili: Shanghai, Uchina (Bara)
    • Jina la Biashara: Mafanikio
    • Nambari ya mfano: ZLP630
    • Utaratibu wa Kuinua: kamba ya waya ya chuma
    • Inua Hifadhi / Utendaji:Pandisha
    • Nguvu:1.5kw*2
    • Imekadiriwa Uwezo wa Kupakia: 630kg
    • Dak. Urefu wa Kuinua: 10m
    • Max. Urefu wa Kuinua: 100m
    • Ukubwa wa Jedwali:6(1+2+3)*0.72*1.3m,7.5(2.5*3)*0.72*1.3m
    • Vipimo vya jumla: 1850 * 1000 * 950 mm
    • Uzito: 850kg
    • Uthibitisho: CE ISO
    • Udhamini: Mwaka 1
    • Huduma ya Baada ya Uuzaji Imetolewa: Wahandisi wanaopatikana kwa huduma za mashine nje ya nchi
    • Maombi:kusafisha kuta kupamba kudumisha
    • Jina: Jukwaa lililosimamishwa
    • Urefu wa kuinua: 100 m
    • Kasi ya kuinua:8~10m/min
    • cable: 100m
    • Voltage: 220v/380v/50hz
    • Rangi: Kiini chekundu
    • Nyenzo: Mabati ya Alumini ya Chuma
    • Maneno muhimu:kitoto
    • Kipengele: Urahisi wa usalama wa Uendeshaji
    Export to: Cape Town, London, Singapore, Oslo etc.
    Related Keywords: Multi Point Suspended Scaffold in Cape Town, Rope Suspended Aerial Platform in Pakistan

Project Information Required

  • Building height and required platform length
  • Workers, tools and material load
  • Voltage, phase and frequency
  • Roof parapet, suspension beam and counterweight conditions

Browse the suspended platform article library or review more ZLP gondola configurations. Installation and operation should follow the approved system and applicable OSHA suspended scaffold requirements.