ZLP1000 High Rise Building Main Construction Steel Suspend
ZLP1000 High Rise Building Main Construction Steel Suspend is a temporary powered access configuration for facade construction, cleaning, painting or maintenance. Platform length, rated load, voltage, hoist model, wire ropes and roof suspension conditions should be confirmed for the actual project.

Image of Success ZLP1000 High rise building main construction steel suspend platforms
Quick Details:
- Place of Origin:Shanghai, China (Mainland)
- Brand Name:Success
- Model Number:ZLP500/630/800/1000
- Loading capacity:500kgs;630kgs;800kgs;1000kgs
- Material:Galvanized Steel/Aluminum
- Surface Treatment:Galvanized;H.D.G or plastic spraying
- Platform Length:2m-12m;OEM
- Electric Motor Power:1.5KW*2; 1.8KW*2; 2.2KW*2;3.0KW*2
- Voltage:380V/50HZ/THREE PHASE 220V/50HZ/SINGLE PHASE
- MAX Lifting height:200M
- Color:Blue, orange, red, silver or customized
- Application:Building Construction;Painting,window cleaning
- Certification:ISO9001/CE/TUV
Related Video:
Description:


Related Accessories Show:


Leave a message:
You may also like:

Advanced ZLP250, ZLP500, ZLP630, ZLP800, ZLP1000 Suspended Platform/ Cradle/ Gondola/ Swing Stage/ Powered Access Platform
- Place of Origin:Shanghai, China (Mainland)
- Brand Name:Success
- Model Number:ZLP500
- Material:Steel, Aluminum Alloy
- Color:Red, Yellow, Blue, etc
- Surface treatment:Powder coating, Hot galvanization
- Length:2m, 2.5m, 3m, 5m, 6m, 7.5m, etc
- Lifing Mechanism:Gear
- Lift Drive/Actuation:Electric Motor
- Power:1.5kw, 1.8kw, 2kw
- Rated Loading Capacity:150kg, 250kg, 500kg, 630kg, 800kg, 1000kg
- Max. Lifting Height:200m
- Voltage:Suspended Platform/ Cradle/ Gondola accept different voltage
Export to: Algeria, Hyderabad, Maputo etc.Related Keywords: China Suspended Platform in Algeria, Zlp1000a Steel Suspend Platforms
Durable CE passed Suspended Access Platform, building facade cleaning equipment from factory
- Condition:New
- Place of Origin:Shanghai, China (Mainland)
- Brand Name:China FTH
- Model Number:ZLP1000
- Rated Loading Capacity(kg):1000Kg
- Hoisting Speed:8-10m/min
- Max Lifting Height:100 m
- Dimension(L*W*H):7500*(3*2.5)*720*1300
- Loder Weight:250-1000kg
Export to: Qatar, Semarang etc.Related Keywords: Max Load 800kg Suspended Floating Work Platform in Hyderabad, Safe Working Platform in Maputo
Non-standard ARC-Shaped building suspended platform/ARC-shape cradle outside of chimney coal well maintenance
- Place of Origin:Shanghai, China (Mainland)
- Brand Name:Success
- Model Number:ARC-shaped cradle
- Product name: ARC-Shaped cradle
- Certification:ISO9001:2008,CE,GOST
- Rated load:800kg
- Voltage:380V/50HZ/3Phase
- platfrom dimension(L*W*H)mm:6000(2.5+1+2.5)*720*1300mm
- cable:100m
- lifting height:100m
- Erection & dismantle:Quick assembly without any special tools
- Business type:manufactuer direct supplying
Export to: Indore, Kyrgyzstan, Norway, Algeria etc.Related Keywords: Construction Suspend Platforms in Qatar, Hanging Platform in Semarang
Sale Hoist For Suspended Platform,Working platform
- Condition:New
- Place of Origin:Shanghai, China (Mainland)
- Brand Name:Success
- Model Number:LTD8.O
- Rated Loading Capacity(kg):800Kg
- Hoisting Speed:9.0m/min
- Loder Weight:800kg
- After-sales Service Provided:Engineers available to service machinery overseas
- Power:1.8kw
- Voltage:380V
- Rotational speed:1420r/min
- Fequency:50Hz
Export to: León, Ukraine, Norway, Indore etc.Related Keywords: Zlp1000a Steel Suspend Platforms, Hanging Platform in Semarang
ZLP800 Cleaning Building Glass Equipment
- Place of Origin:China (Mainland)
- Brand Name:JH-Success
- Model Number:ZLP500/630/800/1000
- Name:ZLP electric suspended platform
- Rated load:500kg 630kg 800kg 1000kg
- Lifting speed:8-10m/min
- Dimension:6000(1+2+3m)*720*1300
- Lifting Height:100 m
- Power:1.5KW*2, 1.8KW*2
- Voltage:110V,220V,240V,400V,415V,440V are available
- Certification:CE, ISO,GOST
- Counterweight:1000kg
- Material:Alloy Steel/Hot dipping/steel
Export to: Algeria, Maputo, Semarang, Kyrgyzstan etc.Related Keywords: China Suspended Platform in Algeria, Construction Suspend Platforms in Qatar
Project Information Required
- Building height and required platform length
- Workers, tools and material load
- Voltage, phase and frequency
- Roof parapet, suspension beam and counterweight conditions
Browse the suspended platform article library or review more ZLP gondola configurations. Installation and operation should follow the approved system and applicable OSHA suspended scaffold requirements.





