Shanghai Suspended Scaffold for Bridge
Shanghai Suspended Scaffold for Bridge is a temporary powered access configuration for facade construction, cleaning, painting or maintenance. Platform length, rated load, voltage, hoist model, wire ropes and roof suspension conditions should be confirmed for the actual project.

Image of Shanghai Success suspended scaffold for bridge construction
Quick Details:
- Place of Origin:Shanghai, China (Mainland)
- Brand Name:Success
- Model Number:ZLP
- Name:suspended scaffold for bridge construction
- Color:optional
- Power supply (V):220,380,415,440
- Safety Device:7 item
- Material:Steel or aluminum
- Surface treatment:Paint spraying or hot-dip galvanizing
- Free Part:supply
- steel rope:hot-dip galvanizing
- Hoist:Made of die-casting aluminum
- Certificate:CE,ISO9001-2008
Related Video:
Description:


Related Accessories Show:


Leave a message:
You may also like:

CE proved circular platform
- Place of Origin:Shanghai, China (Mainland)
- Brand Name:JH
- Model Number:ZLP series
- color:red
- certificates:CE GOST ISO
- warranty:one year
- usage:high building
- platform length:1-7.5m
- speed:8-10m/min
- loaded:250-1000kg
- material:steel
Export to: Bogotá, Guinea, Johor etc.Related Keywords: Work Platform Aluminum Machining in Bogotá, Suspended Fitting Platform
Factory supplier zlp250/ 500 suspended hoisting aerial platform manual
- Place of Origin:Shanghai, China (Mainland)
- Brand Name:Success
- Model Number:HJ-SUP-648
- Loading capacity:500kgs;630kgs;800kgs;1000kgs
- Material:Galvanized Steel/Aluminum
- Surface Treatment:Galvanized;H.D.G or plastic spraying
- Platform Length:2m-12m;OEM
- Electric Motor Power:1.5KW*2; 1.8KW*2; 2.2KW*2;3.0KW*2
- Voltage:380V/50HZ/THREE PHASE 220V/50HZ/SINGLE PHASE
- MAX Lifting height:200M
- Color:Blue, orange, red, silver or customized
- Application:Building Construction;Painting,window cleaning
- Certification:ISO9001/CE/TUV
Export to: Papua New Guinea, Surat etc.Related Keywords: Durable Scaffolding Stage Platform in Guinea, Affordable Aerial Work Platform Manufacturer in Johor
hoisting mechanism of ZLP series suspended platform
- Place of Origin:Shanghai, China (Mainland)
- Brand Name:Success
- Model Number:LTD630/800/1000
- After-sales Service Provided:No overseas service provided
- Function:Lifting Platform
- Lifiting Capacity:630kg/800kg/1000kg
- Delivery:7 Days for 380V /50hz
Export to: Visakhapatnam, Leeds, Adelaide, Bogotá etc.Related Keywords: Temporary Suspended Working Platform in Papua New Guinea, L Shape Suspended Platform in Surat
supply parts for suspended platform
- Place of Origin:Shanghai, China (Mainland)
- Brand Name:Success
- Model Number:ZLP630
- Lift Mechanism:ELECTRICAL HOIST
- Lift Drive / Actuation:Other
- Power:380v/3PH
- Rated Loading Capacity:630kg
- Min. Lifting Height:10m
- Max. Lifting Height:100m
- Table Size:600*720*1300mm
- Certification:CE ISO
- Warranty:1 Year
- After-sales Service Provided:Engineers available to service machinery overseas
Export to: Peru, Fez, Adelaide, Visakhapatnam etc.Related Keywords: Suspended Fitting Platform, L Shape Suspended Platform in Surat
ZPL630 hoist lifting hot dipping suspended platform with CE approve
- Place of Origin:Shanghai, China (Mainland)
- Brand Name:Success
- Model Number:ZLP630
- Product name:ZLP1000 steel building platform
- Material:hot dipping
- Voltage:110/220/380/415 Optional
- Rated load:630
- Usage:People's High Rise Building Maintaining Work
- Type:Suspended Working Platform Equipment
- Application:Tall Building Maintenance
- Color:Black\gray\red or customize
- Certificate:CE ISO SQS GOST
- Warranty:1 Year
Export to: Bogotá, Johor, Surat, Leeds etc.Related Keywords: Work Platform Aluminum Machining in Bogotá, Temporary Suspended Working Platform in Papua New Guinea
Project Information Required
- Building height and required platform length
- Workers, tools and material load
- Voltage, phase and frequency
- Roof parapet, suspension beam and counterweight conditions
Browse the suspended platform article library or review more ZLP gondola configurations. Installation and operation should follow the approved system and applicable OSHA suspended scaffold requirements.





