A Single Person Suspended Platform Mast Climber Mast Climbing Work

23 mai 2017

A Single Person Suspended Platform Mast Climber Mast Climbing Work

A Single Person Suspended Platform Mast Climber Mast Climbing Work is a temporary powered access configuration for facade construction, cleaning, painting or maintenance. Platform length, rated load, voltage, hoist model, wire ropes and roof suspension conditions should be confirmed for the actual project.

A single person suspended platform,Mast climber, Mast Climbing work platforms
Image of A single person suspended platform,Mast climber, Mast Climbing work platforms

Détails rapides :

  • État : Neuf
  • Lieu d'origine : Shanghai, Chine (continentale)
  • Nom de marque : JH
  • Numéro de modèle : ZLP
  • Rated Loading Capacity(kg):250kg-1000kg
  • Vitesse de levage : 8-10 m/min
  • Max Lifting Height:300m
  • Dimension(L*W*H):6000*720*1300
  • Loder Weight:250kg-1000kg
  • Service après-vente fourni : Ingénieurs disponibles pour entretenir les machines à l'étranger
  • Forme de la plateforme : forme longue, éventail, cercle, forme en U
  • Platform Material:steel ,A-alloy,hot galvanized
  • Capacity of loading:250kg ~1000kg
  • Coulor:as your request
  • Length of platform:1m-7.5m
  • Certificate:CE, GOST, ISO
  • Brand:JH-Success
  • Model:ZLP500,ZLP630,ZLP800,ZLP1000
  • Motor power:1.5kw,1.8kw,2.2kw
  • Voltage:380v,220v,415v

Vidéo connexe :

Description:

A single person suspended platform,Mast climber, Mast Climbing work platforms
A single person suspended platform,Mast climber, Mast Climbing work platforms

Accessoires associés Afficher:

A single person suspended platform,Mast climber, Mast Climbing work platforms Related Accessories Show
A single person suspended platform,Mast climber, Mast Climbing work platforms Related Accessories Show

Laissez un message:

Vous aimerez peut-être aussi :

  • A Single Person Suspended Platform Mast Climber Mast Climbing Work - image 6

    2014 Best Sale Suspended Platform ZLP500 electric scaffolding from Shanghai Factory

    • Lieu d'origine : Shanghai, Chine (continentale)
    • Nom de marque : Success
    • Model Number:zlp630 zlp800
    • Max Lifting Height:100m
    • Vitesse de levage : 8-10 m/min
    • Motor:380V/50HZ/3Phase
    • Platform dimension:6/7.5×7.2×13
    • câble : 100 m
    • contrepoids : 1000 kg
    • Steel rope:d9.1 d8.3mm
    • locking cable angle:3-8 degree
    • 20'ft container:10sets
    • Puissance : 1,8 kW
    Export to: Bekasi, Faridabad, Karachi etc.
    Related Keywords: Zlp800 Lifting Height Suspended Platform in Bekasi, Stage Platform
  • A Single Person Suspended Platform Mast Climber Mast Climbing Work - image 7

    China moveable end stirrup climber

    • Lieu d'origine : Shanghai, Chine (continentale)
    • Nom de marque : Success
    • Numéro de modèle : ZLP250, ZLP500, ZLP630, ZLP800, ZLP1000
    • Service après-vente fourni : Ingénieurs disponibles pour entretenir les machines à l'étranger
    • Name:moveable end stirrup climber
    • Couleur : facultative
    • Alimentation (V) : 220, 380, 415, 440
    • Dispositif de sécurité : 7 éléments
    • Matériau : acier ou aluminium
    • Traitement de surface : Peinture au pistolet ou galvanisation à chaud
    • Pièce gratuite : fourniture
    • câble en acier : galvanisation à chaud
    • Palan : Fabriqué en aluminium moulé sous pression
    • Certificat : CE, ISO9001-2008
    Export to: Penang, Visakhapatnam etc.
    Related Keywords: Electric Construction Scaffold Suspend Platforms in Faridabad, Building Lifting Suspended Platform in Karachi
  • A Single Person Suspended Platform Mast Climber Mast Climbing Work - image 8

    Powered Suspended Platform/Cradle/Gondola

    • Lieu d'origine : Shanghai, Chine (continentale)
    • Nom de marque : Success
    • Numéro de modèle : ZLP
    • Service après-vente fourni : Ingénieurs disponibles pour entretenir les machines à l'étranger
    • color:red and silver gray
    • shape:Customize according to customer requirements
    Export to: Ghaziabad, Lesotho, Medellín, Bekasi etc.
    Related Keywords: Glass Cleaning Platform in Penang, Manual Lifting Suspended Platform in Visakhapatnam
  • A Single Person Suspended Platform Mast Climber Mast Climbing Work - image 9

    Supplier of ZLP630 rope suspended platform for high rise building

    • Lieu d'origine : Shanghai, Chine (continentale)
    • Nom de marque : Success
    • Model Number:ZLP500.630.800.1000
    • Name:susended platform
    • color:red
    • lifting weight:1000kg
    • lifting height:100m
    • lifting speed:10m/min
    • Tension : 380 V, réglable
    • prix : prix d'usine
    • quality:welcome by customers from world
    Export to: Colombo, Timor-Leste, Medellín, Ghaziabad etc.
    Related Keywords: Stage Platform, Manual Lifting Suspended Platform in Visakhapatnam
  • A Single Person Suspended Platform Mast Climber Mast Climbing Work - image 10

    ZLP630 Aluminium Suspended Access Platform/Gondola / Electric Cradle

    • Lieu d'origine : Shanghai, Chine (continentale)
    • Nom de marque : Success
    • Numéro de modèle : ZLP630
    • Mécanisme de levage : câble en acier
    • Entraînement/Actionnement de l'ascenseur : Palan
    • Puissance : 1,5 kW*2
    • Capacité de charge nominale : 630 kg
    • Hauteur de levage minimale : 10 m
    • Hauteur de levage maximale : 100 m
    • Taille de la table : 6 (1 + 2 + 3) x 0,72 x 1,3 m, 7,5 (2,5 x 3) x 0,72 x 1,3 m
    • Dimensions hors tout : 1850 mm x 1000 mm x 950 mm
    • Poids : 850 kg
    • Certification : CE ISO
    • Garantie : 1 an
    • Service après-vente fourni : Ingénieurs disponibles pour entretenir les machines à l'étranger
    • Application : nettoyer les murs, décorer, entretenir
    • Nom : Plateforme suspendue
    • Hauteur de levage : 100 m
    • Vitesse de levage : 8 à 10 m/min
    • câble : 100 m
    • Tension : 220 V/380 V/50 Hz
    • Couleur : Rouge argenté
    • Matériau : acier, aluminium, galvanisation
    • Mots-clés : berceau
    • Fonctionnalité : Utilisation facile, sécurité et commodité
    Export to: Bekasi, Karachi, Visakhapatnam, Lesotho etc.
    Related Keywords: Zlp800 Lifting Height Suspended Platform in Bekasi, Glass Cleaning Platform in Penang

Project Information Required

  • Building height and required platform length
  • Workers, tools and material load
  • Voltage, phase and frequency
  • Roof parapet, suspension beam and counterweight conditions

Browse the suspended platform article library or review more ZLP gondola configurations. Installation and operation should follow the approved system and applicable OSHA suspended scaffold requirements.