Quick Delivery Building Facade Cleaning Suspended

15 de mayo de 2017

Quick Delivery Building Facade Cleaning Suspended

Quick Delivery Building Facade Cleaning Suspended is a temporary powered access configuration for facade construction, cleaning, painting or maintenance. Platform length, rated load, voltage, hoist model, wire ropes and roof suspension conditions should be confirmed for the actual project.

Quick Delivery building facade cleaning suspended platform
Image of Quick Delivery building facade cleaning suspended platform

Detalles rápidos:

  • Lugar de origen: Shanghái, China (Continental)
  • Marca:Success
  • Número de modelo: ZLP250, ZLP500, ZLP630, ZLP800, ZLP1000
  • Servicio posventa proporcionado: Ingenieros disponibles para dar servicio a maquinaria en el extranjero.
  • Name:building facade cleaning suspended platform
  • Color: opcional
  • Alimentación (V): 220, 380, 415, 440
  • Dispositivo de seguridad: 7 elementos
  • Material: acero o aluminio
  • Tratamiento de superficie: pulverización de pintura o galvanizado por inmersión en caliente
  • Pieza libre: suministro
  • Cable de acero: galvanizado por inmersión en caliente
  • Polipasto: Fabricado en aluminio fundido a presión.
  • Certificado: CE, ISO9001-2008

Vídeo relacionado:

Descripción:

Quick Delivery building facade cleaning suspended platform
Quick Delivery building facade cleaning suspended platform

Accesorios relacionados Mostrar:

Quick Delivery building facade cleaning suspended platform Related Accessories Show
Quick Delivery building facade cleaning suspended platform Related Accessories Show

Dejar un mensaje:

También te puede interesar:

  • Quick Delivery Building Facade Cleaning Suspended - image 6

    2017 new type ZLP400 ZLO500 ZLP800Shanghai Success ZLP630 Construction Suspended Platform

    • Lugar de origen: Shanghái, China (Continental)
    • Marca:Success
    • Model Number:ZLP63
    • Lift Mechanism:Other
    • Lift Drive / Actuation:LTD63
    • Rated Loading Capacity:630kg
    • Max. Lifting Height:100m
    • Overall Dimensions:6*0.69(M)
    • Weight:780kg
    • Certification:CE&ISO
    • Warranty:1year
    • Servicio posventa proporcionado: Ingenieros disponibles para dar servicio a maquinaria en el extranjero.
    • safety lock:swing-arm type used to prevent tilting(2set)
    • wire rope:4*31w+NF-8.3
    • HEAVY HAMMER:10KG PER PIECES (2PIECES)
    • concrete counter- weight:25kg/piece
    • material:galvanized
    • condition:100% new
    • suspended mechanism:adjustable height range:1.15-1.75m
    • the length stretching out of the wall::the length stretching out of the wall:1.1-1.7m
    Export to: Bologna, Islamabad, Lubumbashi etc.
    Related Keywords: Does Loler Apply Suspended Working Platform in Bologna, Suspended Personnel Platform
  • Quick Delivery Building Facade Cleaning Suspended - image 7

    Factory mobile platform access cradle building spider work platform

    • Lugar de origen: Shanghái, China (Continental)
    • Marca:Success
    • Número de modelo: ZLP250 ZLP500 ZLP630 ZLP800 ZLP1000
    • Rated load:1000kg
    • Velocidad de elevación: 8~10 m/min
    • Altura de elevación: 100 m
    • Cable: 100 m
    • Counterweught:1000kg
    Export to: Philadelphia, Wellington etc.
    Related Keywords: Zlp Platform Suspended in Islamabad, Power Hoist Suspended Platform in Lubumbashi
  • Quick Delivery Building Facade Cleaning Suspended - image 8

    LTD630/500/800/1000 Electric Hoist for suspended platform/cradle/gondola

    • Condición:Nuevo
    • Lugar de origen: Shanghái, China (Continental)
    • Marca:Success
    • Model Number:LTD hoist
    • Rated Loading Capacity(kg):1000kg
    • Hoisting Speed:9.0m/min
    • Loder Weight:1000kg
    • Servicio posventa proporcionado: Ingenieros disponibles para dar servicio a maquinaria en el extranjero.
    • Power:1.8kw
    • Voltage:380V
    • Rotational speed:1420r/min
    • Fequency:50Hz
    Export to: Kalyan-Dombivali, Birmingham, Goiania, Bologna etc.
    Related Keywords: Spray Lacquer Suspended Working Platform in Philadelphia, Suspended Platform Construction in Wellington
  • Quick Delivery Building Facade Cleaning Suspended - image 9

    Success ZLP800 Window Cleaning ZLP Series Steel Suspended Access Platform/ Cradle/ Scaffolding

    • Lugar de origen: Shanghái, China (Continental)
    • Marca:Success
    • Número de modelo: ZLP500/630/800/1000
    • Capacidad de carga: 500 kg; 630 kg; 800 kg; 1000 kg
    • Material: acero galvanizado/aluminio
    • Tratamiento de superficie: galvanizado; HDG o pulverización de plástico
    • Longitud de la plataforma: 2 m-12 m; OEM
    • Potencia del motor eléctrico: 1,5 KW*2; 1,8 KW*2; 2,2 KW*2; 3,0 KW*2
    • Voltaje: 380 V/50 Hz/trifásico 220 V/50 Hz/monofásico
    • Altura máxima de elevación: 200 m
    • Color: azul, naranja, rojo, plateado o personalizado.
    • Aplicación: Construcción de edificios, pintura, limpieza de ventanas.
    • Certificación: ISO9001/CE/TUV
    Export to: Palestine, Uzbekistan, Goiania, Kalyan-Dombivali etc.
    Related Keywords: Suspended Personnel Platform, Suspended Platform Construction in Wellington
  • Quick Delivery Building Facade Cleaning Suspended - image 10

    Work lift / suspended scaffolding system with electrical hoist

    • Lugar de origen: Shanghái, China (Continental)
    • Marca:Success
    • Número de modelo: ZLP250 ZLP500 ZLP630 ZLP800 ZLP1000
    • Rated load:1000kg
    • Velocidad de elevación: 8~10 m/min
    • Altura de elevación: 100 m
    • Cable: 100 m
    • Counterweught:1000kg
    Export to: Bologna, Lubumbashi, Wellington, Birmingham etc.
    Related Keywords: Does Loler Apply Suspended Working Platform in Bologna, Spray Lacquer Suspended Working Platform in Philadelphia

Project Information Required

  • Building height and required platform length
  • Workers, tools and material load
  • Voltage, phase and frequency
  • Roof parapet, suspension beam and counterweight conditions

Browse the suspended platform article library or review more ZLP gondola configurations. Installation and operation should follow the approved system and applicable OSHA suspended scaffold requirements.