2015 New ZLP630 Electric Lifting Winches Cradle Gondola Window Cleaning Equipment
25 de mayo de 2017
2015 New ZLP630 Electric Lifting Winches Cradle Gondola Window Cleaning Equipment
2015 New ZLP630 Electric Lifting Winches Cradle Gondola Window Cleaning Equipment is a temporary powered access configuration for facade construction, cleaning, painting or maintenance. Platform length, rated load, voltage, hoist model, wire ropes and roof suspension conditions should be confirmed for the actual project.

Image of 2015 NEW ZLP630 electric lifting winches/ cradle/ gondola/ window cleaning equipment/swing stage/india suspended platform
Detalles rápidos:
- Lugar de origen: Shanghái, China (Continental)
- Marca: Success-CHINA
- Número de modelo: ZLP630
- Usage:Building facade or glass cleaning
- Model:ZLP630 electric lifting winches
- Certificados: ISO, GOST, CE
- Power Source:Electricity
- Drive Type:Wire rope hoisting
- Application:Tall Building Maintenance
- Origin:China
- Velocidad de elevación: 8-10 m/min
- Lifting Height and Cable Length:100m
- Voltage:380V / 220V or according to customer need
Vídeo relacionado:
Descripción:


Accesorios relacionados Mostrar:


Dejar un mensaje:
También te puede interesar:

A single person suspended platform/Pump jack scaffolding
- Condición:Nuevo
- Lugar de origen: Shanghái, China (Continental)
- Marca:Success
- Número de modelo: ZLP
- Capacidad de carga nominal (kg): 630 kg
- Velocidad de elevación: 8-10 m/min
- Altura máxima de elevación: 300 m
- Servicio posventa proporcionado: Ingenieros disponibles para dar servicio a maquinaria en el extranjero.
- Forma de la plataforma: forma larga, abanico, círculo, forma de U…
- Material de la plataforma: acero o aleación A
- Capacidad: desde 250 kg hasta 1000 kg
- Carga nominal: 500 kg, 630 kg, 800 kg, 1000 kg
- Longitud de la plataforma: 1 m - 7,5 m
- Buena calidad: certificado CE, Gost e ISO aprobado.
Export to: Cape Town, Dhaka, Lucknow etc.Related Keywords: Suspended Scaffolding Work Platform in Cape Town, Zlp Aluminum Stage Platform
cheap price temporary suspended platform
- Lugar de origen: Shanghái, China (Continental)
- Marca:Success
- Número de modelo: ZLP630
- Hoister:LTD63
- Platform:6*0.69m
- wire rope:4*31w+NF-8.3
- Safety lock:anti-tilted
- rated load:630kg
- working height:100m
- Heavy hammer:10kg per pieces
- Concrete counter-weight:25kg/piece
- Condition:100% New
- Power Supply:380V/50Hz
Export to: Padang, Turkey etc.Related Keywords: Hydraulic Electric Scaffolding Platform in Dhaka, Electric Boom Construction Platform Lift in Lucknow
high-rise suspendedgondola electric scaffold mobile lifting equipment
- Lugar de origen: Shanghái, China (Continental)
- Marca:Success
- Número de modelo: ZLP250 ZLP500 ZLP630 ZLP800 ZLP1000
- Carga nominal: 630 kg
- Velocidad de elevación: 8~10 m/min
- Altura de elevación: 100 m
- Cable: 100 m
- Counterweight:630kg
Export to: France, Minsk, Santo Domingo, Cape Town etc.Related Keywords: Zlp 800 Suspended Rope Platform in Padang, Manlifts For Sale in Turkey
Suspended platform spare parts Safety clock for suspended platform
- Lugar de origen: Shanghái, China (Continental)
- Marca:Success
- Model Number:LSB
- Model:LSB Series
- Type:Anti-tilting type
- Allowable force:30kN
- Cable Locking Distance:<100mm
- Cable Locking Angle:3°- 8°
- Cable Locking speed:≥22m/min
- Keywords:safety clock
Export to: Ottawa, Uruguay, Santo Domingo, France etc.Related Keywords: Zlp Aluminum Stage Platform, Manlifts For Sale in Turkey
ZLP Series factory high rise gondola cradle aluminium suspended platform
- Lugar de origen: Shanghái, China (Continental)
- Marca:Success
- Número de modelo: ZLP250 ZLP500 ZLP630 ZLP800 ZLP1000
- Carga nominal: 800 kg
- Velocidad de elevación: 8~10 m/min
- Altura de elevación: 100 m
- Cable: 100 m
- Contrapeso: 800 kg
Export to: Cape Town, Lucknow, Turkey, Minsk etc.Related Keywords: Suspended Scaffolding Work Platform in Cape Town, Zlp 800 Suspended Rope Platform in Padang
Project Information Required
- Building height and required platform length
- Workers, tools and material load
- Voltage, phase and frequency
- Roof parapet, suspension beam and counterweight conditions
Browse the suspended platform article library or review more ZLP gondola configurations. Installation and operation should follow the approved system and applicable OSHA suspended scaffold requirements.





