Suspended Wire Rope
Suspended Wire Rope is a temporary powered access configuration for facade construction, cleaning, painting or maintenance. Platform length, rated load, voltage, hoist model, wire ropes and roof suspension conditions should be confirmed for the actual project.

Image of suspended wire rope platform
Schnelle Details:
- Herkunftsort: Shanghai, China (Festland)
- Markenname: JH
- Modellnummer: ZLP630
- Name:suspended wire rope platform
- Oberflächenbehandlung: Farbspritzen
- Load capacity:630kg
- Höhe: 100 m
- Geschwindigkeit: 8 ~ 10 m/min
- Hebezeug: 1,5 kW x2
- Drahtseil aus verzinktem Stahl: 8,3 mm
- Safe lock:2 sets
- Suspension Mechanism:Galvanized
- Gegengewicht: 1000 kg
Ähnliches Video:
Beschreibung:


Zugehöriges Zubehör anzeigen:


Eine Nachricht hinterlassen:
Das könnte dir auch gefallen:

2014 new aluminium climber ZLP800 ZLP630 low price steel construction cradle/suspended platform for high building
- Herkunftsort: Shanghai, China (Festland)
- Markenname: Erfolg
- Model Number:ZLP round work platform
Export to: Calgary, Hofuf, Kuwait etc.Related Keywords: Mature-Tech Aerial Work Platform Manufacturers in Calgary, Safway Swing Stage
Factory of hanging work platform window cleaning lift
- Herkunftsort: Shanghai, China (Festland)
- Markenname: Erfolg
- Modellnummer: ZLP250 ZLP500 ZLP630 ZLP800 ZLP1000
- Rated load:1000kg
- Hubgeschwindigkeit: 8 ~ 10 m/min
- Hubhöhe: 100m
- Kabel: 100 m
- Counterweught:1000kg
Export to: Navi Mumbai, Uganda etc.Related Keywords: Rolling Work Platform in Hofuf, Wire Rope Electric Hoist For Suspended Platform in Kuwait
High Standard zlp800 aluminum suspended aerial work lifting platform
- Herkunftsort: Shanghai, China (Festland)
- Markenname: Erfolg
- Modellnummer: ZLP250, ZLP500, ZLP630, ZLP800, ZLP1000
- Angebotener Kundendienst: Techniker stehen für die Wartung von Maschinen im Ausland zur Verfügung
- Name:zlp800 aluminum suspended aerial work lifting platform
- Farbe: optional
- Stromversorgung (V): 220,380,415,440
- Sicherheitsvorrichtung:7 Artikel
- Material: Stahl oder Aluminium
- Oberflächenbehandlung: Lackieren oder Feuerverzinken
- Freies Teil: Versorgung
- Stahlseil: Feuerverzinkung
- Hebezeug: Aus Aluminium-Druckguss
- Zertifikat: CE, ISO9001-2008
Export to: India , Charleroi, Maceio, Calgary etc.Related Keywords: Window Washer Scaffold in Navi Mumbai, Lift Scaffolding Work Platform in Uganda
Shanghai Success ZLP Alluminum Construction Scaffold
- Herkunftsort: Shanghai, China (Festland)
- Markenname: Erfolg
- Modellnummer: ZLP500/630/800/1000
- Name:ZLP electric suspended platform
- Rated load:500kg 630kg 800kg 1000kg
- Hubgeschwindigkeit: 8-10 m/min
- Abmessung: 6000(1+2+3m)*720*1300
- Hubhöhe: 100 m
- Power:1.5KW*2, 1.8KW*2
- Voltage:110V,220V,240V,400V,415V,440V are available
- Certification:CE, ISO,GOST
- Counterweight:1000kg
- Material:Alloy Steel/Hot dipping/steel
Export to: San Antonio, Bulawayo, Maceio, India etc.Related Keywords: Safway Swing Stage, Lift Scaffolding Work Platform in Uganda
ZLP800 Suspended Gondola Work Platform Scaffolding Cradle Window Cleaning Suspended Gondola(CE,ISO )
- Herkunftsort: Shanghai, China (Festland)
- Markenname: Erfolg
- Modellnummer: ZLP500
- Material: Stahl, Aluminiumlegierung
- Farbe: Rot, Gelb, Blau usw.
- Oberflächenbehandlung: Pulverbeschichtung, Feuerverzinkung
- Länge: 2 m, 2,5 m, 3 m, 5 m, 6 m, 7,5 m usw
- Hebemechanismus: Zahnrad
- Hubantrieb/Betätigung: Elektromotor
- Leistung: 1,5 kW, 1,8 kW, 2 kW
- Nenntragfähigkeit: 150 kg, 250 kg, 500 kg, 630 kg, 800 kg, 1000 kg
- Max. Hubhöhe: 200 m
- Voltage:Window Cleaning Suspended Gondola accept different voltage
Export to: Calgary, Kuwait, Uganda, Charleroi etc.Related Keywords: Mature-Tech Aerial Work Platform Manufacturers in Calgary, Window Washer Scaffold in Navi Mumbai
Project Information Required
- Building height and required platform length
- Workers, tools and material load
- Voltage, phase and frequency
- Roof parapet, suspension beam and counterweight conditions
Browse the suspended platform article library or review more ZLP gondola configurations. Installation and operation should follow the approved system and applicable OSHA suspended scaffold requirements.





