ltm11200 and ac500 tandem lift
A suspended platform, also known as a swing stage or suspended scaffold, is a type of adjustable, temporary platform used for working at heights. It is typically suspended from an overhead structure using ropes, cables, or chains and can be raised or lowered to the desired working level. Suspended platforms are commonly used for tasks such as window cleaning, painting, construction, and maintenance of buildings, especially high-rise structures.
These platforms are equipped with safety features such as guardrails, and workers are required to use personal protective equipment like harnesses to prevent falls. Suspended platforms offer flexibility and access to difficult-to-reach areas, making them an essential tool in many industries where work on vertical surfaces is required
ltm 11200 and ac500-2 assembling a heavy lift overhead crane, i got the idea from the Cuxhaven Germany project
Related Videos
- terex demag cc8800 luffing jib assembly
- Scanclimber mast climbers with monorail lifting equipment at facade work at Hotel Stadt Lörrach
- ORBP: Dual Manitowoc 2250 tandem lift
- liebherr ltm11200 assembly
- LED lights for my potain tower crane
- my custom manitowoc 16000
- Mini Lift,Mini Crane,Electric Mini Lift Supplier,Exporter,Manufacturer
- 5610(5013)Tower Crane,6T Tower Crane,QTZ63 Self Raising Tower Crane from Factory
- Maxim Grove GMK 6450
- New project: CC-8800 Boom Booster
- big 4 railroad bridge project
- Sterett cranes brand new Terex AC500/2
- Terex RT130 setup and a lift
- ZLP800 Building Maintenance Unit,Suspended Platform for Window Cleaning
- ORBP:I-64E to I-65 S on ramp beam install
- Building Material Hoist| Material Lift| Construction Lift| Construction Elevator
- Rack and Pinion Construction Eleavator,Passenger&Material Elevator,Construction Lifter From China
- terex demag cc 8800 assembly and lift
- Heavy hauling, a 2x3x2 with generator load
- January 2016 Collection update
- RS TOWER 5-S Rolling tower
- Liebherr LG 1550 Assembly Timelapse
- Replacement ringer being assembled on the east end bridge
- liebherr ltm11200 with luffing jib erecting a windmill tower