Video of my first drive over the brand new bridge that opened to I-65 N traffic at 10:30pm Dec 6,2015. I drove across at 1pm 12/7/15
Related Videos
- Abraham Lincoln Bridge ribbon cutting
- Liebherr 994 & Cat 349 removing Indiana causeway
- First ride over the brand new “Lewis & Clark” (east end bridge)!
- ORBP: demolishing clark memorial bridge approach ramp
- ORBP: East End Bridge progress
- Walsh Link belt 248 piledriving
- KFC YUM! Center video 2
- East End Bridge IN tower Final Pour
- Scanclimber SC8000 mast climber at bricklaying & masonry work – increased ergonomics & productivity
- Heavy hauling, a 2x3x2 with generator load
- Sterett cranes brand new Terex AC500/2
- Spartan’s Multifunctional Material Hoist
- Padgetts brand new Manitowoc MLC 300
- Sona Stirrup Bender Machine ( Patna Project )
- ZLP630 Suspended Platform Installing
- Vertical Rotary Parking System,Automatic Parking System,Car Stacker,China Jiu Road Brand
- Suspended Cradle for Building Construction Site,High Rise Building Suspended Platformc
- Miller Transfer Kenworth T800w with 3x3x3x3x3
- 25 MM Scrap Straightening Machine
- manitowoc 31000 being unveiled
- Maxim Grove GMK 6450
- maxim grove gmk7550
- 5 install driving mechanism
- link belt HTC 8660 leaving