Cherry Picker Chimney Suspended Access Platform Chimney Suspended
Cherry Picker Chimney Suspended Access Platform Chimney Suspended is a temporary powered access configuration for facade construction, cleaning, painting or maintenance. Platform length, rated load, voltage, hoist model, wire ropes and roof suspension conditions should be confirmed for the actual project.

Image of Cherry picker Chimney Suspended Access Platform Chimney suspended platform
간략한 세부 정보:
- Condition:New
- 원산지: 중국 상하이(본토)
- Brand Name:Jiu Hong
- 모델 번호:ZLP
- Rated Loading Capacity(kg):630Kg
- Hoisting Speed:8-10m/min
- Max Lifting Height:300m
- platform shape:long shape, fan, circle, U shap…
- Platform Material:steel or A-alloy
- capacity: from 250kg to 1000kg
- Rated Load:500Kg 630Kg 800Kg 1000Kg
- Length of platform:1m-7.5m
- good quality:CE, Gost , ISO certificate approved
관련 영상:
설명:


관련 액세서리 보기:


메시지를 남겨주세요:
다음도 좋아하실 수 있습니다:

2017 China ZLP series Success brand suspended access platforms
- 원산지: 중국 상하이(본토)
- 브랜드 이름:Success
- 모델 번호:ZLP
- Name:Success brand suspended access platforms
- 색상:선택사항
- 전원 공급 장치(V):220,380,415,440
- 안전장치 : 7개 품목
- 재질: 강철 또는 알루미늄
- 표면처리 : 페인트 분무 또는 열간도금
- 무료 부품:공급
- 강철 로프: 아연 도금
- 호이스트: 다이캐스팅 알루미늄으로 제작
- 인증: CE, ISO9001-2008
Export to: Bhopal, Giza, Manaus etc.Related Keywords: Construction Lift Platform in Bhopal, Aluminum Stage Lift Working Platform
Factory Price Electric Suspended Scaffolding Window Cleaning Platform
- 원산지: 중국 상하이(본토)
- 브랜드 이름:Success
- Model Number:HJ-SUP202
- Product name:Factory Price Electric Suspended Scaffolding Window Cleaning Platform
- 표면 보호: 페인팅 및 아연 도금
- Keywords:Electric Suspended Scaffolding Window Cleaning Platform
- 색상: 빨간색, 노란색, 기타
- 인증 : ISO, CE, GOST 인증
- 유형: 건설 플랫폼
- 인증서: ISO, CE, GOST 인증
- 시장: 글로벌, 30개국 이상
- 품목:플랫폼 일시 중단
- 원산지: 상하이, 중국(본토)
Export to: Naucalpan, Vijayawada etc.Related Keywords: Elevated Work Platforms in Giza, Suspended Platform Model Zlp-800 7.5m in Manaus
Gondola-lift Suspended Platform for Building External Wall Cleaning
- 원산지: 중국 상하이(본토)
- 브랜드 이름:Success
- Model Number:ZLP250 ZLP500 ZLP630 ZLP800 ZLP1000
- 정격하중: 630kg
- Lifting speed:8~10m/min
- Lifting height:100m
- 케이블:100m
- Counterweught:630kg
Export to: Iraq, Madagascar, Sao Goncalo, Bhopal etc.Related Keywords: Rolling Work Platform in Naucalpan, Affordable Rope Suspended Platform in Vijayawada
Shanghai Success Brand ZLP800 Suspended Platform 100m Cable, 7.5m Length and 800Kg Capacity
- 원산지: 중국 상하이(본토)
- Brand Name:Success-CHINA
- 모델 번호:ZLP800
- Steel Rope Diamerter:8.3mm
- Rated Power:1.8KW X 2
- Voltage:380V or according to customer need
- Counterweight:1000KG
- 20'ft container:9 sets
- 리프팅 속도: 8-10m/분
- 리프팅 높이: 100m
- 케이블:100m
Export to: Doha, Kumasi, Sao Goncalo, Iraq etc.Related Keywords: Aluminum Stage Lift Working Platform, Affordable Rope Suspended Platform in Vijayawada
ZLP800 Aluminum Suspended Platform/Swing Stage/Powered Access Platform
- 원산지: 중국 상하이(본토)
- 브랜드 이름:Success
- 모델 번호:ZLP630
- Lift Mechanism:steel wire rope
- Lift Drive / Actuation:Hoist
- Power:1.5kw*2
- Rated Loading Capacity:630kg
- Min. Lifting Height:10m
- 최대 리프팅 높이: 100m
- Table Size:6(1+2+3)*0.72*1.3m,7.5(2.5*3)*0.72*1.3m
- Overall Dimensions:1850mm*1000mm*950mm
- Weight:850kg
- Certification:CE ISO
- 보증 기간: 1년
- 애프터 서비스 제공: 해외 기계 서비스 가능한 엔지니어
- Application:clean walls decorat maintain
- Name:Suspended platform
- Lifting height:100m
- Lifting speed:8~10m/min
- cable:100m
- Voltage:220v/380v/50hz
- Color:Red sliver
- Material:Steel Aluminum
- Keywords:cradle
- Feature:Easy Operation safety convenience
Export to: Bhopal, Manaus, Vijayawada, Madagascar etc.Related Keywords: Construction Lift Platform in Bhopal, Rolling Work Platform in Naucalpan
Project Information Required
- Building height and required platform length
- Workers, tools and material load
- Voltage, phase and frequency
- Roof parapet, suspension beam and counterweight conditions
Browse the suspended platform article library or review more ZLP gondola configurations. Installation and operation should follow the approved system and applicable OSHA suspended scaffold requirements.





